Saturday, 23 April 2011

Thakot Bridge

The load curing capacity of existing bridge is required to enhance to cope with the heavy machinery required to be transported through bridge (KKH) at Basha Dam site. Further due to change of seismic factor the bridge design as been revised. In revised design 32 permanent anchors in Piers No. 3, 4 & 7 have been introduced and foundation sizes have been revised. The project is composed of RCC Box girder, main bridge of 234 meter long, 85 meter wide with 385m approaches.
Thakot Bridge

Thakot Bridge

Thakot Bridge

Thakot Bridge

Thakot Bridge

No comments:

Post a Comment